Portfolio – Commercial

Richemont Group Head Office

Richemont Group Head office

Working closely with the Richemont group and MODE PD, we have delivered the electrical upgrade works to the office suites, including; New lighting, new power, mains intake upgrades and new mains distribution.

Project: Richemont Group Head office
Contract value: £48,000.00
Sector: Private client
Duration: 12 weeks
Status: Completed Autumn 2018

City & Guilds London Art School (Stone Studio)

City & Guilds London Art School (Stone Studio)

Working Closely with MODE PD, we have delivered the electrical upgrade works to the Stone studio, including; Stone cutting equipment, new lighting system, suspended power track systems and an LD1 fire alarm to the London Art School.

Project: City & Guilds London Art School (Stone Studio)
Contract value: £48,000.00
Sector: Public Sector
Duration: 6 Week Summer holiday
Status: Completed Summer 2018

Gallions Mount School

Gallions Mount School

Contracted directly by the London borough of Greenwich, we have successfully delivered brand new external and play ground lighting – Including ground work and installation of specialist lamp post flood lighting.

Project: Gallions Mount School
Contract value: £65,000.00
Sector: Public Sector
Duration: 6 Week Summer holiday
Status: Completed Summer 2018

Moatbridge School

Moatbridge School

Contracted directly by the London borough of Greenwich, we have successfully delivered the full electrical upgrade to the school in it’s entirety. Works included new fire alarm, new lighting system, new power system, mains upgrades and boiler room control upgrades.

Project: Moatbridge School
Contract value: £280,000.00
Sector: Public Sector
Duration: 6 Week Summer holiday
Status: Completed Summer 2018

Cardwell School

Cardwell School

Contracted directly by the London borough of Greenwich, we have successfully delivered the full electrical upgrade to the school in it’s entirety. Works included new fire alarm, new lighting system, new power system, mains upgrades and boiler room control upgrades.

Project: Cardwell School
Contract value: £310,000.00
Sector: Public Sector
Duration: 6 Week Summer holiday
Status: Completed Summer 2018

Heathlands School

Working with the London Borough of Hounslow & AMMCASS Group we have successfully delivered the full refurbishment and installation of a commercial kitchen in the time critical 6 week summer holiday.

Project: Heathlands School
Contract value: £150,000.00
Sector: Public Sector
Duration: 6 Week Summer holiday
Status: Completed Summer 2018

Woolwich Arsenal

Woolwich Arsenal

Working closely with Ingleton Wood, on behalf of the London Borough of Greenwich, we have successfully completed a brand new fire alarm, CCTV and intruder alarm system to the Heritage centre, Fire power museum and The Old officers “mess”.

City & Guilds London Art Gallery

City & Guilds London Art Gallery

Working closely with the London Art Gallery, we successfully delivered a new emergency lighting system, fire alarm system and full power system. Delivered ahead of programme and to budget in a 3 week programme.

Rainbow Nursery, Bromley

Rainbow Nursery, Bromley

We have recently completed the full electrical installation and bespoke LED feature lighting for the Rainbow Nursery in Bromley. Delivered to programme and to budget in a 4 week programme!

City Sprint, London

City Sprint, London

During the renovation of the courier companies brand new head office, we worked closely with Interco, a specialist office fit out contractor – To successfully deliver the installation of an audio visual control system, brand new lighting and a specialist floor powered electrak system.

Reiss, London

Reiss, London

We recently converted the fashion brands lighting at their storage facility, from candescent lamps to an energy efficient LED alternative – Saving them an estimated figure of £13,600 PA.

Lulu Guiness, London

Lulu Guiness, London

Working closely with Interco, we rewired the fashion brands, brand new head office – Fully inclusive of an audio visual control system, brand new lighting and a specialist floor powered electrak system.

New Regents College, London

New Regents College, London

Working closely with a specialist electrical design company, Ingleton Wood, we rewired the school in it’s entirety. Installing new lighting, power layouts, as well as the installation of new main incoming fuse boards and dedicated circuitry for the school’s IT servers and IT suites.

All of this was achieved in an six week summer holiday programme to enable the school to successfully re-open for the the new autumn term.

Mandeville Primary School, London

Mandeville Primary School, London

Working closely with a specialist electrical design company, Ingleton Wood, we rewired the school in it’s entirety. Installing new lighting, power layouts, as well as the installation of new main incoming fuse boards and dedicated circuitry for the school’s IT servers and IT suites.

All of this was achieved in an six week summer holiday programme to enable the school to successfully re-open for the the new autumn term.

Greenwich Theatre, London

Greenwich Theatre, London

We rewired The Greenwich Theatre in it’s entirety. Designing and installing the theatre’s lighting, power layouts, as well as the installation of the specialist dimming and racking equipment that controlled all of the stage and feature lighting.

All of this was achieved in an eight week programme to enable the Theatre to successfully re-open for the first show of the summer, “The rise and the fall of the little voice”.

The show must go on…….